Winter projects

After the weekend it starts. At the same time, all installations are improved and weight-centered in the actuator part of the boat. The aft system is changed to vinch. 4 times gearing and a 40 vinch on each side by the storskotar. New heater. And more. Plastic damage and Installation in Svinninge are the main contractor and Speed Made Good and TYMAR Marinelektronik handle tire equipment or electrical installations etc. At the same time, the other tyre layout will be updated and the boat will have the extra love it so well deserves after 13 years on the race tracks. About 1000 living nights and 35000nm.